Complete AON Network for the Project and Resource Allocation Schedule by Phase.

Complete AON Network for the Project and Resource Allocation Schedule by Phase.

Using the Scope I have attached I need a Complete AON Network for the Project and Resource Allocation Schedule by Phase.

The Complete AON Network for the Project (see p. 181 for example)
o Must contain completed grid squares for each activity, including:
 ES (Earliest Start)
 EF (Earliest Finish)
 LS (Latest Start)
 LF (Latest Finish)
 SL (Slack Time)
 DUR (Activity Duration)
o Must identify the critical path on the network
o Include 1 paragraph discussing if/when non-critical activities can be
dropped

The Resource Allocation Schedule by Phase (see p. 264 for example) must include
o A listing of all resources (human, equipment, etc.) required for each phase/activity during each week of the project in tabular format
o Include 1-2 paragraphs providing details of the resources needed/listed

WE HAVE HAD A GOOD SUCCESS RATE ON THIS ASSIGBNMENT. PLACE AN ORDER WITH SCHOLAR WRITERS AND GET 100% ORIGINAL PAPERS

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>