Score 100%- Week 5 – Quiz 3 Week 5 – APU

Question 1 of 10                                                                                  0.3 Points

Recently how many people people died when a ship collided with an oil platform in the Bombay High oil field area, sparking a fire that gutted a rig that produced one sixth of India’s oil?

A.1200

B.120

C.12

D.12,000

Answer Key: C

Question 2 of 10                                                                                  0.3 Points

There are about how many offshore platforms around the globe and many onshore?

A.60,000

B.6,000

C.600

D.60

Answer Key: B

Question 3 of 10                                                                                  0.3 Points

Generally, there are how many industry standards or norms for an integrated safety and security solution applied within the oil and gas supply chain?

A.Many

B.Very Few

C.No

D.Too many to count

Answer Key: C

Question 4 of 10                                                                                  0.3 Points

In the Smith reading, how long did the project take?

A.1.5 years

B.2.5 years

C.1 year

D.1.75 years

Answer Key: A

Question 5 of 10                                                                                  0.3 Points

What is a professional corporation offering a comprehensive range of consulting services in applied earth and environmental sciences, including geotechnical and environmental engineering, construction materials testing, geophysics and drilling?

A.Geptechnology

B.Gentechnology

C.Gertechnology

D.Geotechnology

Answer Key: D

Question 6 of 10                                                                                  0.3 Points

According to Smith’s (2010) article Logistics is key during pre-design for linear pipeline, “Geotechnical subsurface exploration involved drilling borings at Geotechnical subsurface exploration involved drilling borings at _____________spaced intervals along overland areas and drilling four borings to predetermined depths at HDD crossings.

A.2 – 3 mile

B.2 – 5 mile

C.1 – 10 mile

D.1 – 4 mile

Answer Key: D

Question 7 of 10                                                                                  0.3 Points

For the HDD alignments, how many borings were typically located on each side of the feature?

A.20

B.2

C.200

D.2000

Answer Key: B

Question 8 of 10                                                                                  0.3 Points

According to Smith, how many reports were delivered as produced over a the year and a half period?

A.240000

B.2400

C.240

D.24

Answer Key: D

Question 9 of 10                                                                                  0.3 Points

What is Smith’s current position?

A.currently the branch manager for the Geotechnology, Inc. Collinsville. CA

B.currently the branch manager for the Geotechnology, Inc. Collinsville. IL

C.currently the branch manager for the Gertechnology, Inc. Collinsville. IL

D.currently the branch manager for the Gentechnology, Inc. Collinsville. IL

Answer Key: B

Question 10 of 10                                                                                   0.3 Points

Why was the decision made to cease the use of HDD in this area and move to a more costly alternative.

A.High accuracy in locating potential voids.

B.Because HDD is the most cost effective method.

C.

The ability to accurately locate 90 percent of potential voids along the HDD alignment.

D.

The inability to accurately locate 100 percent of potential voids along the HDD alignment.

Answer Key: D

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>